Description:
First-year Cessna 170 with freshly recovered Stewart Systems fabric wings, complete logs since new, and updated Garmin communications equipment.
Highlights
• 3,151.9 hours total time
• Continental O-300-C (145 HP)
• 1,502 hours since engine installation
• McCauley fixed-pitch propeller
• Stewart Systems fabric wing recover (2023)
• Complete airframe logs since new
• Cleveland wheels and brakes
• Dorsal fin installed per FAA Form 337
Avionics
• Garmin GTR 200B COM
• Garmin GTX 327 transponder
• Narco MK12A NAV/COM
• Narco VOA4 indicator
• ACK E-04 406 MHz ELT
Inspection Status
• Annual: July 2026 (due July 2027)
• New magnetos installed April 2025
Contact: Hiller Aviation Consulting